| |
|
| |
| |
|
| |
"SBEM's Automation Division"
|
| |
|
| |
Complete Control and Instrumentation Solution for Turnkey Projects |
| |
FULL RESPONSIBILITY OF DESIGN, TECHNOLOGY, EXECUTION, INSTALLATION &
TRAINING IN ORDER TO PROVIDE COMPLETE "CUSTOMER SATISFACTION" |
| |
|
| Scope: |
| |
- Study of User Requirement
- Technical Proposals as per Requirement with detailed C & I Diagrams
- Solution within the agreed Quality, Time and Cost
|
| |
Project Management |
| |
All Resources managed and organized by PROJECT DRIVER in the interest of the Customers |
| |
|
| |
- Concept
- Design
- Execution
- Implementation
- Completion / Handover
|
| |
Concept and Design |
| |
- Site Survey
- Analysis of the Requirement
- Formulation of System Requirements
- Project Schedule
|
|
| |
Project Planning
Depending upon the User Requirements, Our Engineers produce the basic Engineering for the Automation of your Plant |
| |
- Bill of Material
- C & I Diagram
- Specifications of each Item / System
- Technical Proposal
- Commercial Proposal
|
| |
Detailed Engineering
This phase of Engineering begins after Job confirmation |
| |
- Selection of Items as per specifications
- Detailed Job Order Drawings for entire Project
- Cabling Details
- Customer's Approval
- Manufacturing
- Testing
- Documentation
- Quality approval
- Inspection
|
| |
Installation and Commissioning
This phase begins after Final Acceptance Test/Customer Inspection |
| |
- Installation and Cabling
- Commissioning including System Integration, Device Configuration and Testing
- Site Acceptance Test
|
| |
Support & Training
|
| |
- Annual Maintenance Contract
- Telephonic Head Office / Branch Office
- Repair and Replacement Service
- Training
|
|
| |
|
|
|
| |
|
|
| |
|
|
|
|
|
| |
|
| |
 |
| Electro Magnetic Flow Meter |
| |
 |
|
|
| |
|
|